The following pages link to Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119):
Displaying 33 items.
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- When it is worthwhile to work with the stochastic RCPSP? (Q835549) (← links)
- A two-stage stochastic programming approach for project planning with uncertain activity durations (Q835555) (← links)
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (Q852940) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- Multi-resource allocation in stochastic project scheduling (Q1931636) (← links)
- Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems (Q1991259) (← links)
- Using schedule risk analysis with resource constraints for project control (Q2028756) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Proactive policies for the stochastic resource-constrained project scheduling problem (Q2275822) (← links)
- The proactive and reactive resource-constrained project scheduling problem (Q2281615) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- Multimode resource-constrained project scheduling in flexible projects (Q2301187) (← links)
- An evolutionary approach for resource constrained project scheduling with uncertain changes (Q2664456) (← links)
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem (Q2668660) (← links)
- Robust local search for solving RCPSP/max with durational uncertainty (Q2887065) (← links)
- A lexicographic approach to the robust resource-constrained project scheduling problem (Q2968494) (← links)
- A RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH REATTEMPT AT FAILURE : A HEURISTIC APPROACH (Q4367070) (← links)
- A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework (Q4685811) (← links)
- A computational study on bounding the makespan distribution in stochastic project networks (Q5948194) (← links)
- Project scheduling under the threat of catastrophic disruption (Q6112627) (← links)
- A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem (Q6554641) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)
- Maximizing the net present value of a project under uncertainty: activity delays and dynamic policies (Q6572829) (← links)