Pages that link to "Item:Q2356179"
From MaRDI portal
The following pages link to An exact algorithm to minimize mean squared deviation of job completion times about a common due date (Q2356179):
Displaying 9 items.
- Minimizing weighted mean absolute deviation of job completion times from their weighted mean (Q548013) (← links)
- Scheduling about a given common due date to minimize mean squared deviation of completion times (Q1266598) (← links)
- A quadratic integer programming method for minimizing the mean squared deviation of completion times (Q1342085) (← links)
- The single machine weighted mean squared deviation problem (Q1753598) (← links)
- On the complexity of the single machine scheduling problem minimizing total weighted delay penalty (Q1785249) (← links)
- Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job (Q2185530) (← links)
- An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs (Q2483505) (← links)
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date (Q3777790) (← links)
- Minimizing mean squared deviation of completion times with maximum tardiness constraint (Q5925939) (← links)