Pages that link to "Item:Q2357384"
From MaRDI portal
The following pages link to Corrigendum to: ``An FPTAS for the parallel two-stage flowshop problem'' (Q2357384):
Displaying 10 items.
- Corrigendum to: ``Solving the flexible job shop scheduling problem with sequence-dependent setup times'' (Q2242323) (← links)
- On scheduling inclined jobs on multiple two-stage flowshops (Q2319904) (← links)
- A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops (Q2329473) (← links)
- Scheduling two-stage jobs on multiple flowshops (Q2419124) (← links)
- A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops (Q2420659) (← links)
- An effective Benders decomposition algorithm for solving the distributed permutation flowshop scheduling problem (Q2664346) (← links)
- Maximizing total early work in a distributed two‐machine flow‐shop (Q6078603) (← links)
- On scheduling multiple parallel two-stage flowshops with Johnson's rule (Q6197646) (← links)
- Applying Johnson's rule in scheduling multiple parallel two-stage flowshops (Q6535816) (← links)
- A polynomial-time approximation scheme for an arbitrary number of parallel identical multi-stage flow-shops (Q6546990) (← links)