Pages that link to "Item:Q2358307"
From MaRDI portal
The following pages link to Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307):
Displaying 5 items.
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine (Q1037662) (← links)
- Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines (Q1590047) (← links)
- Heterogeneous-criteria scheduling: Minimizing weighted number of tardy jobs and weighted completion time (Q1905089) (← links)
- A new branch and bound algorithm for minimizing the weighted number of tardy jobs (Q2638922) (← links)
- Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time (Q4661237) (← links)