Pages that link to "Item:Q2364487"
From MaRDI portal
The following pages link to Tight MIP formulations for bounded up/down times and interval-dependent start-ups (Q2364487):
Displaying 7 items.
- Start-up/shut-down MINLP formulations for the unit commitment with ramp constraints (Q2056921) (← links)
- Modeling flexible generator operating regions via chance-constrained stochastic unit commitment (Q2221469) (← links)
- Min-up/min-down polytopes (Q2386215) (← links)
- Strategic Planning with Start-Time Dependent Variable Costs (Q3100421) (← links)
- A Polyhedral Study on Fuel-Constrained Unit Commitment (Q5060802) (← links)
- Integrated Stochastic Optimal Self-Scheduling for Two-Settlement Electricity Markets (Q5087741) (← links)
- On Mixed-Integer Programming Formulations for the Unit Commitment Problem (Q5148170) (← links)