Pages that link to "Item:Q2370337"
From MaRDI portal
The following pages link to Project scheduling problem with mixed uncertainty of randomness and fuzziness (Q2370337):
Displaying 13 items.
- Multiobjective project portfolio selection with fuzzy constraints (Q342776) (← links)
- Fuzzy project scheduling problem and its hybrid intelligent algorithm (Q967803) (← links)
- Nash equilibria in competitive project scheduling (Q976353) (← links)
- Fuzzy-probabilistic PERT (Q1686504) (← links)
- An information axiom based decision making approach under hybrid uncertain environments (Q1749185) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- A possibilistic approach to the modeling and resolution of uncertain closed-loop logistics (Q1927262) (← links)
- Solving project scheduling problem with the philosophy of fuzzy random programming (Q1927267) (← links)
- Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff (Q2336747) (← links)
- Existence and uniqueness of solution for fuzzy random differential equations with non-Lipschitz coefficients (Q2385686) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Project scheduling problem with stochastic activity duration times (Q2572685) (← links)
- (Q3204313) (← links)