Pages that link to "Item:Q2421327"
From MaRDI portal
The following pages link to MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints (Q2421327):
Displaying 9 items.
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods (Q1979194) (← links)
- A two-stage solution approach for plastic injection machines scheduling problem (Q1983688) (← links)
- Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: application in the offshore oil and gas industry (Q2027046) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Exact and heuristic algorithms for the parallel machine total completion time scheduling problem with dual resources, ready times, and sequence-dependent setup times (Q2147050) (← links)
- A matheuristic algorithm for the one-dimensional cutting stock and scheduling problem with heterogeneous orders (Q2307325) (← links)
- Application of a hybrid evolutionary algorithm to resource-constrained parallel machine scheduling with setup times (Q2669803) (← links)
- Heuristics for flow shop rescheduling with mixed blocking constraints (Q6592920) (← links)