The following pages link to A Boolean satisfiability approach to the resource-constrained project scheduling problem (Q2430594):
Displaying 9 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints (Q2029253) (← links)
- meSAT: multiple encodings of CSP to SAT (Q2342599) (← links)
- Energetic reasoning for energy-constrained scheduling with a continuous resource (Q2356117) (← links)
- Solving RCPSP/max by lazy clause generation (Q2434317) (← links)
- Major 2 Satisfiability Logic in Discrete Hopfield Neural Network (Q5072024) (← links)
- A genetic algorithm for the resource-constrained project scheduling problem with alternative subgraphs using a Boolean satisfiability solver (Q6565426) (← links)