Pages that link to "Item:Q2432854"
From MaRDI portal
The following pages link to A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times (Q2432854):
Displaying 12 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- A study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup times (Q337074) (← links)
- Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness (Q398925) (← links)
- A GRASP based on DE to solve single machine scheduling problem with SDST (Q434179) (← links)
- A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain (Q662246) (← links)
- A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine (Q835634) (← links)
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times (Q2270448) (← links)
- Redesign of production flow lines to postpone product differentiation (Q3055277) (← links)
- Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study (Q3055316) (← links)
- (Q3641992) (← links)
- Single Machine Scheduling with Major and Minor Setup Times: A Tabu Search Approach (Q4717156) (← links)
- Multiple machine JIT scheduling: a tabu search approach (Q5428715) (← links)