Pages that link to "Item:Q2433467"
From MaRDI portal
The following pages link to The multiple-job repair kit problem (Q2433467):
Displaying 13 items.
- Multiple period repair kit problem with a job completion criterion: A case study (Q1129889) (← links)
- The repair kit problem with positive replenishment lead times and fixed ordering costs (Q1753639) (← links)
- OR in spare parts management: a review (Q1754102) (← links)
- Timing intermittent demand with time-varying order-up-to levels (Q2160500) (← links)
- The repair kit problem with imperfect advance demand information (Q2171602) (← links)
- Optimising a general repair kit problem with a service constraint (Q2654321) (← links)
- Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests (Q2676368) (← links)
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate” (Q3340472) (← links)
- Optimization of Industrial-Scale Assemble-to-Order Systems (Q3458752) (← links)
- On the Replenishment of Repair Kit Inventories for Systems with Life Distributions of Phase Type (Q3724063) (← links)
- The Repair Kit Problem Revisited (Q4286477) (← links)
- The added value of advance demand information for the planning of a repair kit (Q6100688) (← links)
- The repair kit problem with fixed delivery costs (Q6606703) (← links)