Pages that link to "Item:Q2456646"
From MaRDI portal
The following pages link to A two-machine flowshop scheduling problem with a separated maintenance constraint (Q2456646):
Displaying 12 items.
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Scheduling a maintenance activity and due-window assignment on a single machine (Q1010256) (← links)
- Scheduling a maintenance activity to minimize total weighted completion-time (Q1029850) (← links)
- Scheduling two machines that require multiple types of maintenance, for a single operation (Q1841155) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Two-machine flow shop scheduling integrated with preventive maintenance planning (Q2795170) (← links)
- A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection (Q3195328) (← links)
- (Q3685558) (← links)
- Two-machine flow shop with synchronized periodic maintenance (Q5380990) (← links)
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown (Q6179225) (← links)
- Artificial intelligence application in production scheduling problem systematic literature review: bibliometric analysis, research trend, and knowledge taxonomy (Q6559485) (← links)
- Scheduling with cardinality dependent unavailability periods (Q6565385) (← links)