Pages that link to "Item:Q2464217"
From MaRDI portal
The following pages link to Feasible job insertions in the multi-processor-task job shop (Q2464217):
Displaying 6 items.
- Scheduling coupled-operation jobs with exact time-lags (Q714025) (← links)
- Feasible insertions in job shop scheduling, short cycles and stable sets (Q856271) (← links)
- The resource-constrained activity insertion problem with minimum and maximum time lags (Q1041351) (← links)
- A branch and bound algorithm and iterative reordering strategies for inserting additional trains in real time: a case study in Germany (Q1665246) (← links)
- Optimal job insertion in the no-wait job shop (Q2392741) (← links)
- Complexity of the job insertion problem in multi-stage scheduling (Q2467449) (← links)