Pages that link to "Item:Q2466598"
From MaRDI portal
The following pages link to An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times (Q2466598):
Displaying 14 items.
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization (Q342414) (← links)
- Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance (Q342566) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Minimizing the fleet size with dependent time-window and single-track constraints (Q1317008) (← links)
- An improved hybrid model for the generic hoist scheduling problem (Q1854759) (← links)
- A solution for cyclic scheduling of multi-hoists without overlapping (Q2271830) (← links)
- Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions (Q2434294) (← links)
- Cyclic Scheduling of Multimodal Concurrently Flowing Processes (Q2950469) (← links)
- Cyclic scheduling in robotic flowshops with bounded work-in-process levels (Q2994797) (← links)
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints (Q3989141) (← links)
- Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions (Q4380546) (← links)
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem (Q5322091) (← links)