Pages that link to "Item:Q2471329"
From MaRDI portal
The following pages link to Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model (Q2471329):
Displaying 6 items.
- Single machine stochastic JIT scheduling problem subject to machine breakdowns (Q931488) (← links)
- Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties (Q943438) (← links)
- Optimal rules for single machine scheduling with stochastic breakdowns (Q1717990) (← links)
- Bi-objective single machine scheduling problem with stochastic processing times (Q2343079) (← links)
- A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair (Q3415869) (← links)
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties (Q4272902) (← links)