Pages that link to "Item:Q2476643"
From MaRDI portal
The following pages link to Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm (Q2476643):
Displaying 9 items.
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems (Q440881) (← links)
- A multi-objective particle swarm for a flow shop scheduling problem (Q867030) (← links)
- Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking (Q1615967) (← links)
- An exact algorithm for the bi-objective timing problem (Q1653286) (← links)
- An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem (Q1736634) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- A shuffled frog-leaping algorithm for multi-objective no-wait flowshop scheduling (Q2918239) (← links)
- Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping (Q5059417) (← links)