Pages that link to "Item:Q2481965"
From MaRDI portal
The following pages link to Parallel-machine scheduling with time dependent processing times (Q2481965):
Displaying 29 items.
- Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects (Q336434) (← links)
- Uniform parallel-machine scheduling with time dependent processing times (Q457550) (← links)
- Optimizing busy time on parallel machines (Q476900) (← links)
- Processing time generation schemes for parallel machine scheduling problems with various correlation structures (Q490376) (← links)
- Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects (Q534943) (← links)
- Single-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration (Q613268) (← links)
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration (Q621032) (← links)
- Parallel-machine scheduling with deteriorating jobs and rejection (Q708217) (← links)
- Equivalent time-dependent scheduling problems (Q1041934) (← links)
- Parallel machine batching and scheduling with deadlines (Q1567300) (← links)
- Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration (Q1634051) (← links)
- Parallel-machine scheduling with time-dependent and machine availability constraints (Q1667046) (← links)
- Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities (Q1762135) (← links)
- Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959) (← links)
- Parallel machine scheduling models with fuzzy processing times (Q1886763) (← links)
- Parallel machine scheduling with time dependent processing times (Q1923596) (← links)
- Parallel-machine scheduling of jobs with mixed job-, machine- and position-dependent processing times (Q2168720) (← links)
- Two parallel-machine scheduling problems with function constraint (Q2187975) (← links)
- Scheduling jobs with normally distributed processing times on parallel machines (Q2242242) (← links)
- A unified view of parallel machine scheduling with interdependent processing rates (Q2286430) (← links)
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems (Q2305016) (← links)
- Unrelated parallel-machine scheduling problems with multiple rate-modifying activities (Q2446459) (← links)
- Parallel-machine scheduling with potential disruption and positional-dependent processing times (Q2628178) (← links)
- Scheduling with deteriorating jobs and non-simultaneous machine available times (Q2788530) (← links)
- (Q3170676) (← links)
- Parallel Machine Scheduling: Processing Rates Dependent on Number of Jobs in Operation (Q3777787) (← links)
- (Q4986080) (← links)
- A note on unrelated parallel machine scheduling with time-dependent processing times (Q5901464) (← links)
- A note on unrelated parallel machine scheduling with time-dependent processing times (Q5901502) (← links)