Pages that link to "Item:Q2482749"
From MaRDI portal
The following pages link to Proactive heuristic procedures for robust project scheduling: An experimental analysis (Q2482749):
Displaying 32 items.
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (Q309061) (← links)
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- Robust berth scheduling with uncertain vessel delay and handling time (Q763208) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- A heuristic procedure for solving the dynamic probabilistic project expediting problem (Q948658) (← links)
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- Solve-and-robustify (Q2268511) (← links)
- Proactive policies for the stochastic resource-constrained project scheduling problem (Q2275822) (← links)
- The proactive and reactive resource-constrained project scheduling problem (Q2281615) (← links)
- Proactive and reactive strategies for football league timetabling (Q2282571) (← links)
- Triage scheduling optimization for mass casualty and disaster response (Q2788521) (← links)
- Proactive Reactive Scheduling in Resource Constrained Projects with Flexibility and Quality Robustness Requirements (Q3195321) (← links)
- Robust Buffer Allocation for Scheduling of a Project with Predefined Milestones (Q4931918) (← links)
- Project scheduling under the threat of catastrophic disruption (Q6112627) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff (Q6146634) (← links)
- Tabu search for proactive project scheduling problem with flexible resources (Q6164385) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- A robust multi-project scheduling problem under a resource dedication-transfer policy (Q6573375) (← links)