Pages that link to "Item:Q2482750"
From MaRDI portal
The following pages link to A bi-objective coordination setup problem in a two-stage production system (Q2482750):
Displaying 6 items.
- A lower bound on the Hamiltonian path completion number of a line graph (Q902504) (← links)
- Process selection and sequencing in a two-agents production system (Q1432015) (← links)
- Set-up coordination between two stages of a supply chain (Q1599325) (← links)
- Coordination in a two-stage production system: complexity, conflict and cooperation (Q1762107) (← links)
- Microforecasting methods for fresh food supply chain management: a computational study (Q1997065) (← links)
- Setup coordination between two stages of a production system: a multi-objective evolutionary approach (Q2379870) (← links)