Pages that link to "Item:Q2482794"
From MaRDI portal
The following pages link to Multi-mode project payment scheduling problems with bonus-penalty structure (Q2482794):
Displaying 17 items.
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem (Q994252) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models (Q1634073) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- The Impact of Contractor Behavior on the Client’s Payment-Scheduling Problem (Q3530955) (← links)
- (Q4901420) (← links)
- An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows (Q6551096) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)