Pages that link to "Item:Q2482799"
From MaRDI portal
The following pages link to Predictive-reactive scheduling on a single resource with uncertain future jobs (Q2482799):
Displaying 9 items.
- Reactive and proactive single-machine scheduling to maintain a maximum number of starting times (Q829172) (← links)
- Predictive-reactive scheduling for single surgical suite subject to random emergency surgery (Q887886) (← links)
- An approach to predictive-reactive scheduling of parallel machines subject to disruptions (Q940874) (← links)
- A multi-objective optimization approach for exploring the cost and makespan trade-off in additive manufacturing (Q2140160) (← links)
- Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job (Q2185530) (← links)
- An anticipative scheduling approach with controllable processing times (Q2654388) (← links)
- Optimizing makespan and stability risks in job shop scheduling (Q2664315) (← links)
- Predictive-reactive strategy for identical parallel machine rescheduling (Q2669491) (← links)
- Robust Predictive-Reactive Scheduling: An Information-Based Decision Tree Model (Q6485173) (← links)