Pages that link to "Item:Q2565776"
From MaRDI portal
The following pages link to Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups (Q2565776):
Displaying 11 items.
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times (Q958443) (← links)
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates (Q1630186) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem (Q1736622) (← links)
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem (Q2341222) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220) (← links)
- A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem (Q5172421) (← links)
- Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem (Q6096611) (← links)