Pages that link to "Item:Q2572254"
From MaRDI portal
The following pages link to Optimal dynamic assignment of a flexible worker on an open production line with specialists (Q2572254):
Displaying 18 items.
- Optimal control of queueing systems with non-collaborating servers (Q333457) (← links)
- Optimal assignment of servers to tasks when collaboration is inefficient (Q364078) (← links)
- Flexible servers in tandem lines with setup costs (Q383223) (← links)
- Dynamic control of a flexible server in an assembly-type queue with setup costs (Q383229) (← links)
- Profit maximization in flexible serial queueing networks (Q475122) (← links)
- Throughput maximization for two station tandem systems: a proof of the Andradóttir-Ayhan conjecture (Q543558) (← links)
- Analysis of a two-phase queueing system with a fixed-size batch policy (Q976408) (← links)
- Embedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case study (Q2273660) (← links)
- Optimal server assignment in a two-stage tandem queueing system (Q2294532) (← links)
- Dynamic task assignment for throughput maximization with worksharing (Q2569071) (← links)
- Sample path optimal policies for serial lines with flexible workers (Q2897164) (← links)
- Operator allocation planning for reconfigurable production line in one-of-a-kind production (Q2997882) (← links)
- Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost (Q3116744) (← links)
- PERFORMANCE EVALUATION OF OPEN QUEUEING NETWORKS WITH FUZZY PARAMETERS (Q3424272) (← links)
- Unbalanced production line scheduling with partial job specialization (Q3489772) (← links)
- Design and control of agile automated CONWIP production lines (Q3621911) (← links)
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines (Q4363688) (← links)
- Dynamic load balancing with flexible workers (Q5395353) (← links)