Pages that link to "Item:Q2572768"
From MaRDI portal
The following pages link to A genetic algorithm approach for the time-cost trade-off in PERT networks (Q2572768):
Displaying 13 items.
- Allocating slacks in stochastic PERT network (Q301152) (← links)
- A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations (Q337079) (← links)
- Modeling stochastic project time-cost trade-offs with time-dependent activity durations (Q440901) (← links)
- Solution of interval PERT/CPM network problems by a simplified tabular method (Q505096) (← links)
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem (Q732489) (← links)
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- Applying fuzzy method for measuring criticality in project network (Q881877) (← links)
- A multi-objective resource allocation problem in dynamic PERT networks (Q945351) (← links)
- New fuzzy models for time-cost trade-off problem (Q975376) (← links)
- Fuzzy finish time modeling for project scheduling (Q1622409) (← links)
- A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project (Q2076443) (← links)
- Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff (Q2336747) (← links)
- Time-cost trade-off via optimal control theory in Markov PERT networks (Q2480200) (← links)