The following pages link to Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594):
Displaying 29 items.
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem (Q310345) (← links)
- Multi-project scheduling with two-stage decomposition (Q490148) (← links)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (Q1291582) (← links)
- Heuristics for multimode scheduling problems with dedicated resources (Q1296081) (← links)
- Resource constrained routing and scheduling: review and research prospects (Q1694813) (← links)
- A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem (Q1718076) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- (Q3614333) (← links)
- (Q3821922) (← links)
- Project scheduling and equipment planning with random breakdowns (Q4578170) (← links)
- Multidirectional scheduling scheme in resource‐constrained project schedulingproblem (Q4632818) (← links)
- (Q4641067) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- Integration based on the parametrisation of conics (Q5860077) (← links)
- Multi-mode resource constrained project scheduling problem along with contractor selection (Q5889173) (← links)
- Dynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraint (Q6043112) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- A robust multi-project scheduling problem under a resource dedication-transfer policy (Q6573375) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)