Pages that link to "Item:Q2656739"
From MaRDI portal
The following pages link to A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: trade-off between production costs and energy consumption (Q2656739):
Displaying 10 items.
- Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout (Q1712074) (← links)
- Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing (Q2283857) (← links)
- Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping (Q2669726) (← links)
- Memory gradient method for multiobjective optimization (Q2700431) (← links)
- (Q5383440) (← links)
- A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time (Q6048213) (← links)
- Shop scheduling in manufacturing environments: a review (Q6060656) (← links)
- Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints (Q6109801) (← links)
- A systematic review of multi-objective hybrid flow shop scheduling (Q6112731) (← links)
- Convergence of a new nonmonotone memory gradient method for unconstrained multiobjective optimization via robust approach (Q6561498) (← links)