Pages that link to "Item:Q2664314"
From MaRDI portal
The following pages link to Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314):
Displaying 6 items.
- Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (Q1666440) (← links)
- Bi-objective ant colony optimization approach to optimize production and maintenance scheduling (Q2270442) (← links)
- \(N\)-NEH+ algorithm for solving permutation flow shop problems (Q2668738) (← links)
- Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems (Q2675651) (← links)
- Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity (Q6109346) (← links)
- Deterministic constructive \(\nu N\)-NEH+ algorithm to solve permutation flow shop scheduling problem with makespan criterion (Q6551067) (← links)