Pages that link to "Item:Q2664351"
From MaRDI portal
The following pages link to Scheduling jobs with release dates on identical parallel machines by minimizing the total weighted completion time (Q2664351):
Displaying 17 items.
- Parallel batch scheduling of equal-length jobs with release and due dates (Q600846) (← links)
- Dominance rules for the parallel machine total weighted tardiness scheduling problem with release dates (Q632665) (← links)
- A branch-and-bound algorithm to minimize total weighted completion time on identical parallel machines with job release dates (Q941541) (← links)
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms (Q965714) (← links)
- Scheduling jobs with release dates on parallel batch processing machines (Q1026144) (← links)
- Enhanced arc-flow formulations to minimize weighted completion time on identical parallel machines (Q1711446) (← links)
- GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times (Q1945095) (← links)
- Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization (Q2029254) (← links)
- Arc flow formulations based on dynamic programming: theoretical foundations and applications (Q2239929) (← links)
- An exact extended formulation for the unrelated parallel machine total weighted completion time problem (Q2400044) (← links)
- Infinite split scheduling: a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periods (Q2430608) (← links)
- Arc-flow approach for single batch-processing machine scheduling (Q2669497) (← links)
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date (Q2676340) (← links)
- A new Lagrangian Relaxation Algorithm for scheduling dissimilar parallel machines with release dates (Q3102810) (← links)
- Fast Scheduling of Weighted Unit Jobs with Release Times and Deadlines (Q3521921) (← links)
- Formulating a scheduling problem with almost identical jobs by using positional completion times (Q5101423) (← links)
- Dynamic scheduling of patients in emergency departments (Q6113312) (← links)