Pages that link to "Item:Q2669577"
From MaRDI portal
The following pages link to Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem (Q2669577):
Displaying 5 items.
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- Just-in-time scheduling for a distributed concrete precast flow shop system (Q2668621) (← links)
- A branch-and-cut approach for the distributed no-wait flowshop scheduling problem (Q2676404) (← links)
- Model and algorithms of the distributed permutation flow shop scheduling problem with machine eligibility constraints (Q5197293) (← links)
- Automatic design of constructive heuristics for a reconfigurable distributed flowshop group scheduling problem (Q6065623) (← links)