Pages that link to "Item:Q2676357"
From MaRDI portal
The following pages link to An integrated approach for a new flexible multi-product disassembly line balancing problem (Q2676357):
Displaying 11 items.
- Second order conic approximation for disassembly line design with joint probabilistic constraints (Q320132) (← links)
- A sample average approximation method for disassembly line balancing problem under uncertainty (Q337118) (← links)
- Type-E disassembly line balancing problem with multi-manned workstations (Q779771) (← links)
- An exact solution method for multi-manned disassembly line design with and/or precedence relations (Q821861) (← links)
- A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times (Q828843) (← links)
- A dynamic programming approach to a multi-objective disassembly line balancing problem (Q2150762) (← links)
- Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information (Q2156305) (← links)
- A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines (Q2393485) (← links)
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach (Q2664414) (← links)
- Mixed integer programming approaches to partial disassembly line balancing and sequencing problem (Q2669667) (← links)
- Collection-disassembly-delivery problem of disassembly centers in a reverse logistics network (Q6555134) (← links)