Pages that link to "Item:Q2764877"
From MaRDI portal
The following pages link to Lead time variability reduction on EMQ model with imperfect production process (Q2764877):
Displaying 3 items.
- Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time (Q342365) (← links)
- Lead-time variability reduction in stochastic inventory models (Q1205690) (← links)
- Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system (Q4611484) (← links)