Pages that link to "Item:Q2767746"
From MaRDI portal
The following pages link to On conducting simultaneous versus sequential engineering activities in risky R \& D (Q2767746):
Displaying 3 items.
- Dynamic optimisation in the presence of threshold effects when the location of the threshold is uncertain -- with an application to a possible disintegration of the Western Antarctic Ice Sheet (Q956549) (← links)
- Optimal expenditure patterns of a double-path engineering project (Q1584031) (← links)
- How risky should an R\& D program be? (Q1934753) (← links)