Pages that link to "Item:Q2795170"
From MaRDI portal
The following pages link to Two-machine flow shop scheduling integrated with preventive maintenance planning (Q2795170):
Displaying 11 items.
- An integrated cost model for production scheduling and perfect maintenance (Q553937) (← links)
- Considering scheduling and preventive maintenance in the flowshop sequencing problem (Q883296) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Integrating preventive maintenance planning and production scheduling under reentrant job shop (Q1993028) (← links)
- A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities (Q2222085) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Integrating production scheduling and preventive maintenance for a single machine with due window (Q3461443) (← links)
- Optimal maintenance policy incorporating system level and unit level for mechanical systems (Q5027598) (← links)
- Incorporating preventive maintenance into the <i>m</i>-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study (Q5058979) (← links)
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220) (← links)
- Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process (Q5438259) (← links)