Pages that link to "Item:Q2835695"
From MaRDI portal
The following pages link to Optimization Models for Multi-period Railway Rolling Stock Assignment (Q2835695):
Displaying 15 items.
- The best rail fleet mix problem (Q949392) (← links)
- A simulated annealing approach for the multi-periodic rail-car fleet sizing problem (Q1000958) (← links)
- An integrated optimization model for train crew management (Q1610909) (← links)
- Synthetic optimization model and algorithm for railway freight center station location and wagon flow organization problem (Q1717930) (← links)
- Selecting the superpositioning of models for railway freight forecasting (Q1735214) (← links)
- An optimization model for freight transport using urban rail transit (Q1754289) (← links)
- Handbook of optimization in the railway industry (Q1785800) (← links)
- A new multi-objective optimization formulation for rail-car fleet sizing problems (Q1958658) (← links)
- Solving multi-objective optimization formulation for fleet planning in a railway industry (Q2430600) (← links)
- A rolling stock circulation model for combining and splitting of passenger trains (Q2503094) (← links)
- A search-based approach to railway rolling stock allocation problems (Q2905277) (← links)
- (Q3525414) (← links)
- Multi-objective model for optimizing railway infrastructure asset renewal (Q5059239) (← links)
- Asset replacement for an urban railway using a modified two-cycle replacement model (Q5429825) (← links)
- Operations Research in passenger railway transportation (Q5438545) (← links)