The following pages link to Nicholas G. Hall (Q284834):
Displaying 50 items.
- Multitasking via alternate and shared processing: algorithms and complexity (Q284835) (← links)
- On auction protocols for decentralized scheduling (Q550202) (← links)
- Heuristic solutions and confidence intervals for the multicovering problem (Q579132) (← links)
- An on-line assignment problem with random effectiveness and costly information (Q581216) (← links)
- The coordination of scheduling and batch deliveries (Q816348) (← links)
- Online production planning to maximize the number of on-time orders (Q829183) (← links)
- Average and worst-case analysis of heuristics for the maximum tardiness problem (Q1080771) (← links)
- A fast approximation algorithm for the multicovering problem (Q1082267) (← links)
- Bin packing problems in one dimension: Heuristic solutions and confidence intervals (Q1098774) (← links)
- Separate vs. joint replenishment policies with maximum storage requirement costs (Q1106087) (← links)
- A maximin procedure for the optimal insertion timing of ad executions (Q1127135) (← links)
- On the complexity of generalized due date scheduling problems (Q1175769) (← links)
- Proof of a conjecture of Schrage about the completion time variance problem (Q1183389) (← links)
- The multicovering problem (Q1205691) (← links)
- Scheduling in robotic cells: Complexity and steady state analysis (Q1296691) (← links)
- Pareto optimality and a class of set covering heuristics (Q1309875) (← links)
- Maximizing the value of a space mission (Q1342007) (← links)
- Preemptive scheduling with finite capacity input buffers (Q1374452) (← links)
- Design and operational issues in AGV-served manufacturing systems (Q1383126) (← links)
- Scheduling large robotic cells without buffers (Q1383142) (← links)
- Scheduling and lot streaming in flowshops with no-wait in process (Q1404270) (← links)
- Parallel machine scheduling with a common server (Q1566574) (← links)
- Operational decisions in AGV-served flowshop loops: Scheduling (Q1599339) (← links)
- Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition (Q1599340) (← links)
- The complexity of cyclic shop scheduling problems (Q1607980) (← links)
- Capacity allocation games without an initial sequence (Q1709948) (← links)
- A probabilistic analysis of the maximal covering location problem (Q1801679) (← links)
- Towards equitable distribution via proportional equity constraints (Q1803612) (← links)
- Incentive schemes for resolving Parkinson's law in project management (Q2028911) (← links)
- Supply chain scheduling (Q2064031) (← links)
- Fatigue, personnel scheduling and operations: review and research opportunities (Q2242368) (← links)
- In memoriam: Dr. Joseph Leung (Q2317135) (← links)
- Supply chain scheduling: sequence coordination (Q2433797) (← links)
- The significance of deterministic empty vehicle trips in the design of a unidirectional loop flow path (Q2459390) (← links)
- Scheduling with finite capacity output buffers (Q2770137) (← links)
- Scheduling with finite capacity input buffers (Q2781130) (← links)
- Rescheduling for multiple new orders (Q2892374) (← links)
- The Generation of Experimental Data for Computational Testing in Optimization (Q3064516) (← links)
- Rescheduling for Job Unavailability (Q3098270) (← links)
- Capacity Allocation and Scheduling in Supply Chains (Q3098333) (← links)
- Online Scheduling with Known Arrival Times (Q3169021) (← links)
- Performance Prediction and Preselection for Optimization and Heuristic Solution Procedures (Q3392107) (← links)
- Supply Chain Scheduling: Conflict and Cooperation in Assembly Systems (Q3392135) (← links)
- Managing Underperformance Risk in Project Portfolio Selection (Q3450467) (← links)
- Scheduling with Fixed Delivery Dates (Q3634987) (← links)
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications (Q3635039) (← links)
- Supply Chain Scheduling: Batching and Delivery (Q3637369) (← links)
- Rescheduling for New Orders (Q3637438) (← links)
- Single- and multiple-processor models for minimizing completion time variance (Q3735434) (← links)
- Production problems with deadline penalties (Q3738897) (← links)