Pages that link to "Item:Q2890475"
From MaRDI portal
The following pages link to Lower bounds for the head-body-tail problem on parallel machines: a computational study of the multiprocessor flow shop (Q2890475):
Displaying 10 items.
- Bounding strategies for the hybrid flow shop scheduling problem (Q545969) (← links)
- Energetic reasoning revisited: Application to parallel machine scheduling (Q835610) (← links)
- Search tree based approaches for parallel machine scheduling (Q941538) (← links)
- A review of exact solution methods for the non-preemptive multiprocessor flowshop problem (Q1767678) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Multiple-machine lower bounds for shop-scheduling problems (Q2884494) (← links)
- Scheduling to minimize total weighted completion time: Performance guarantees of LP-based heuristics and lower bounds (Q4645931) (← links)
- Solving open benchmark instances for the job-shop problem by parallel head-tail adjustments (Q5932283) (← links)
- Preemptive hybrid flowshop scheduling problem of interval orders (Q5956203) (← links)