Pages that link to "Item:Q2911577"
From MaRDI portal
The following pages link to A single-machine two-agent scheduling problem by GA approach (Q2911577):
Displaying 8 items.
- A tabu method for a two-agent single-machine scheduling with deterioration jobs (Q336450) (← links)
- A time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agents (Q380599) (← links)
- A two-agent single-machine scheduling problem to minimize the total cost with release dates (Q1701559) (← links)
- Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms (Q1721321) (← links)
- A single-machine two-agent scheduling problem by a branch-and-bound and three simulated annealing algorithms (Q1723459) (← links)
- Solving a two-agent single-machine scheduling problem considering learning effect (Q1762153) (← links)
- A subset-sum type formulation of a two-agent single-machine scheduling problem (Q2281162) (← links)
- A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion (Q4689397) (← links)