Pages that link to "Item:Q2958668"
From MaRDI portal
The following pages link to Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization (Q2958668):
Displaying 23 items.
- Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times (Q336752) (← links)
- Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects (Q534943) (← links)
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints (Q833543) (← links)
- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach (Q856080) (← links)
- Scheduling unrelated parallel machines with sequence-dependent setups (Q883307) (← links)
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times (Q941547) (← links)
- Minimising earliness and tardiness on parallel machines with sequence-dependent setups (Q973440) (← links)
- A scheduling problem with unrelated parallel machines and sequence dependent setups (Q973463) (← links)
- A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times (Q1046712) (← links)
- Early/tardy scheduling with sequence dependent setups on uniform parallel machines (Q1302575) (← links)
- Reformulations and an exact algorithm for unrelated parallel machine scheduling problems with setup times (Q1628056) (← links)
- On the \(m\)-clique free interval subgraphs polytope: polyhedral analysis and applications (Q1631662) (← links)
- A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server (Q1634053) (← links)
- A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem (Q1692274) (← links)
- Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness (Q2108098) (← links)
- An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines (Q2256404) (← links)
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics (Q2273664) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- Just-in-time scheduling for a distributed concrete precast flow shop system (Q2668621) (← links)
- Estimation of distribution algorithm with path relinking for the blocking flow-shop scheduling problem (Q5058781) (← links)
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times (Q6070133) (← links)
- Scheduling unrelated parallel machine problem with multi-mode processing times and batch delivery cost (Q6105902) (← links)
- Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs (Q6491320) (← links)