Pages that link to "Item:Q2974333"
From MaRDI portal
The following pages link to Investment Decisions Under Uncertainty Using Stochastic Dynamic Programming: A Case Study of Wind Power (Q2974333):
Displaying 6 items.
- Microgrid investment under uncertainty: a real option approach using closed form contingent analysis (Q256632) (← links)
- Risk neutral and risk averse approaches to multistage renewable investment planning under uncertainty (Q322602) (← links)
- Photovoltaic power plants: a multicriteria approach to investment decisions and a case study in western Spain (Q342797) (← links)
- A decision-making tool for project investments based on real options: the case of wind power generation (Q646672) (← links)
- Leaving well-worn paths: reversal of the investment-uncertainty relationship and flexible biogas plant operation (Q2116939) (← links)
- Investment timing and optimal capacity choice for small hydropower projects (Q2482835) (← links)