Pages that link to "Item:Q2974345"
From MaRDI portal
The following pages link to Optimal Planning of Distributed Generation via Nonlinear Optimization and Genetic Algorithms (Q2974345):
Displaying 8 items.
- Optimal location of FACTS devices in a power system solved by a hybrid approach (Q852561) (← links)
- Ant colony search algorithm for optimal generators startup during power system restoration (Q966405) (← links)
- A heuristic approach for optimal planning and operation of distribution systems (Q1659349) (← links)
- Optimal long-term distributed generation planning and reconfiguration of distribution systems: an accelerating Benders' decomposition approach (Q1730814) (← links)
- Application of multi-objective optimization algorithm for siting and sizing of distributed generations in distribution networks (Q2025069) (← links)
- Multi-objective optimization of distributed generation considering economic benefits (Q2992778) (← links)
- (Q3634043) (← links)
- Switch allocation problem in power distribution systems with distributed generation (Q6168372) (← links)