Pages that link to "Item:Q299816"
From MaRDI portal
The following pages link to Optimization-based heuristics for underground mine scheduling (Q299816):
Displaying 15 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- A sliding time window heuristic for open pit mine block sequencing (Q691428) (← links)
- Using aggregation to optimize long-term production planning at an underground mine (Q852993) (← links)
- Optimizing the open pit-to-underground mining transition (Q1752806) (← links)
- Linear models for stockpiling in open-pit mine production scheduling problems (Q1753425) (← links)
- A shortest-path algorithm for solving the fleet management problem in underground mines (Q1780759) (← links)
- Underground mine scheduling under uncertainty (Q2031110) (← links)
- Short- and medium-term optimization of underground mine planning using constraint programming (Q2112619) (← links)
- Efficient algorithms of pathwise dynamic programming for decision optimization in mining operations (Q2178364) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- Short-term planning optimization model for underground mines (Q2289891) (← links)
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search (Q2664365) (← links)
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm (Q5058828) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- Pattern search method for accelerating Stope boundary optimization problem in underground mining operations (Q6094504) (← links)