Pages that link to "Item:Q3055324"
From MaRDI portal
The following pages link to A scatter search approach to sequence-dependent setup times job shop scheduling (Q3055324):
Displaying 7 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem (Q336962) (← links)
- Scatter search with path relinking for the job shop with time lags and setup times (Q337556) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- Evaluation of the migrated solutions for distributing reference point-based multi-objective optimization algorithms (Q2200624) (← links)
- A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches (Q3163273) (← links)
- An advanced scatter search algorithm for solving job shops with sequence dependent and non-anticipatory setups (Q4589091) (← links)