Pages that link to "Item:Q3055403"
From MaRDI portal
The following pages link to Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic (Q3055403):
Displaying 5 items.
- Hybrid flow-shop scheduling problems with multiprocessor task systems. (Q1410328) (← links)
- A discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraints (Q1762015) (← links)
- Heuristics for scheduling in a flow shop with multiple processors (Q1806647) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Climbing Depth-Bounded Adjacent Discrepancy Search for Solving Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks (Q3003281) (← links)