The following pages link to (Q3072899):
Displaying 21 items.
- Resource allocation in multi-class dynamic PERT networks with finite capacity (Q320114) (← links)
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- Resource allocation in dynamic PERT networks with finite capacity (Q420887) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (Q707776) (← links)
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem (Q1718076) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885) (← links)
- Application of GA optimization for solving precedent relationship problem in project scheduling (Q2450431) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793) (← links)
- Research on the complicated time-constrained project scheduling in water conservancy (Q2824469) (← links)
- A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem (Q2893339) (← links)
- A teaching-learning-based optimization algorithm for multi-objective resource constrained project scheduling problem (Q2992352) (← links)
- A multi-colony ant algorithm for multi-objective resource-constrained project scheduling (Q3016991) (← links)
- (Q3426436) (← links)
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource (Q5059351) (← links)
- A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem (Q5174108) (← links)