Pages that link to "Item:Q309050"
From MaRDI portal
The following pages link to A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing (Q309050):
Displaying 13 items.
- Parallel machine scheduling with time constraints on machine qualifications (Q1738819) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Iterated greedy algorithms for a complex parallel machine scheduling problem (Q2116861) (← links)
- On the exact solution of a large class of parallel machine scheduling problems (Q2197322) (← links)
- Multiobjective optimization for complex flexible job-shop scheduling problems (Q2239940) (← links)
- Enhanced salp swarm algorithm based on firefly algorithm for unrelated parallel machine scheduling with setup times (Q2243380) (← links)
- Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem (Q2273695) (← links)
- Unrelated parallel machine scheduling with new criteria: complexity and models (Q2668730) (← links)
- Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping (Q2669726) (← links)
- Application of a hybrid evolutionary algorithm to resource-constrained parallel machine scheduling with setup times (Q2669803) (← links)
- Minimizing the sum of completion times on a single machine with health index and flexible maintenance operations (Q6109303) (← links)
- A simulation optimization framework to solve stochastic flexible job-shop scheduling problems -- case: semiconductor manufacturing (Q6551110) (← links)