Pages that link to "Item:Q3098286"
From MaRDI portal
The following pages link to Coordinated Multistage Scheduling of Parallel Batch-Processing Machines Under Multiresource Constraints (Q3098286):
Displaying 10 items.
- Scheduling parallel-machine batch operations to maximize on-time delivery performance (Q341468) (← links)
- Coordinating decentralized local schedulers in complex supply chain manufacturing (Q940924) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- Integrated scheduling of production and distribution for manufacturers with parallel batching facilities (Q1800447) (← links)
- Genetic algorithm for job scheduling with maintenance consideration in semiconductor manufacturing process (Q1955314) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- A survey of scheduling with parallel batch (p-batch) processing (Q2076906) (← links)
- A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities (Q2222085) (← links)
- An algorithm of asymmetric three workshops integrated scheduling with batch equalization processing (Q3132721) (← links)
- Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes (Q5172586) (← links)