Pages that link to "Item:Q3103160"
From MaRDI portal
The following pages link to An integrated inventory model with controllable lead time and distribution-free demand (Q3103160):
Displaying 19 items.
- Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time (Q342365) (← links)
- Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints (Q346045) (← links)
- Min-max distribution free continuous-review model with a service level constraint and variable lead time (Q530051) (← links)
- The impact of supply chain visibility when lead time is random (Q1936593) (← links)
- Distribution-free continuous review inventory model with controllable lead time and setup cost in the presence of a service level constraint (Q1955299) (← links)
- A production-delivery lot sizing policy with stochastic delivery time and in consideration of transportation cost (Q2010062) (← links)
- Impact of uncertain demand and lead-time reduction on two-echelon supply chain (Q2171379) (← links)
- A periodic review policy for a coordinated single vendor-multiple buyers supply chain with controllable lead time and distribution-free approach (Q2240673) (← links)
- An integrated producer-buyer supply chain with delivery cost under stochastic transportation time (Q2284717) (← links)
- Delivery performance in vendor selection decisions (Q2432926) (← links)
- Integrated inventory model with stochastic lead time and controllable variability for milk runs (Q2450817) (← links)
- Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction (Q2572251) (← links)
- A manufacturer-buyers integrated inventory model with generic distribution of lead times to deliver equal and/or unequal batch sizes (Q2664401) (← links)
- Two-echelon supply chain inventory model with controllable lead time (Q2824925) (← links)
- Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model (Q2954361) (← links)
- (Q3404770) (← links)
- A novel approach to safety stock management in a coordinated supply chain with controllable lead time using present value (Q4628724) (← links)
- Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment (Q4823499) (← links)
- (Q5143883) (← links)