Pages that link to "Item:Q3114749"
From MaRDI portal
The following pages link to Project Contracts and Payment Schedules: The Client's Problem (Q3114749):
Displaying 21 items.
- A game theoretical approach to sharing penalties and rewards in projects (Q421792) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Scheduling projects with stochastic activity duration to maximize expected net present value (Q1042042) (← links)
- An equitable approach to the payment scheduling problem in project management (Q1590032) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Finding an optimal Nash equilibrium to the multi-agent project scheduling problem (Q1707826) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Multi-mode project payment scheduling problems with bonus-penalty structure (Q2482794) (← links)
- The Impact of Contractor Behavior on the Client’s Payment-Scheduling Problem (Q3530955) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- On modelling payments in projects (Q4359923) (← links)
- Payment scheduling under project crashing based on project progress (Q4601574) (← links)
- Work Package Sizing and Project Performance (Q4971582) (← links)
- An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows (Q6551096) (← links)