Pages that link to "Item:Q3120643"
From MaRDI portal
The following pages link to Determining crane areas for balancing workload among interfering and noninterfering cranes (Q3120643):
Displaying 10 items.
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438) (← links)
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (Q513546) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals (Q1784912) (← links)
- Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference (Q1991274) (← links)
- Levelling crane workload in multi-yard rail-road container terminals (Q2030338) (← links)
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909) (← links)
- Determining crane areas in intermodal transshipment yards: the yard partition problem (Q2655623) (← links)
- A branch and bound approach for the tower crane selection and positioning problem with respect to mutual interference (Q2688882) (← links)
- Optimally scheduling interfering and non‐interfering cranes (Q4632986) (← links)