Pages that link to "Item:Q3153829"
From MaRDI portal
The following pages link to Scheduling problem in a two-machine flow line with the<i>N</i>-step prior-job-dependent set-up times (Q3153829):
Displaying 5 items.
- Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (Q1060679) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Modelling adaptive multi-agent manufacturing control with discrete event system formalism (Q4678216) (← links)
- Scheduling of a Two-machine Flowshop with Processing Time Linearly Dependent on Job Waiting-time (Q4732296) (← links)
- Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations (Q5168017) (← links)