Pages that link to "Item:Q3154444"
From MaRDI portal
The following pages link to The selection of joint projects by a consortium: Cost sharing mechanisms (Q3154444):
Displaying 6 items.
- Methods dealing with complexity in selecting joint venture contractors for large-scale infrastructure projects (Q680836) (← links)
- Shared network investment (Q698244) (← links)
- Choosing and sharing (Q719901) (← links)
- Incentive-compatible cost-allocation schemes (Q1332715) (← links)
- A discrete cost sharing model with technological cooperation (Q2376076) (← links)
- Research joint ventures: A cooperative game for competitors (Q5953345) (← links)